National Repository of Grey Literature 3 records found  Search took 0.01 seconds. 
Substitution for a current source of heat in the industrial area
Novák, Jan ; Fiedler, Jan (referee) ; Lisý, Martin (advisor)
The main aim of the thesis is to design a final draft for the reconstruction of the central heating plant of the industrial complex. The background research outlines a brief description of the development of heating plant industry, boilers and conditions for the selection of a suitable heat source for the particular area. Further, there are listed standard possibilities of heat sources for industrial complex, which does not use heat for technological purposes only, but as well as for heating and warming up of supply water. The finding and presentation section summarize the current energy supply and the design of two variants for conceptual modernization of the boiler plant. According to the annual and daily chart for the need for heat, there are specified required heat outputs, which are supposed to be distributed to the campus network of heating and as well as the fuel consumption. One of the options considers the use of storage tanks. The conclusion compares both suggested options.
Novostavba rodinného domu
Jahůdka, Martin
The thesis deals with processing of project documentation of the new building constructed in form frame wooden construction. Project documentation contains design drawings needed to acquire building permit. Thesis describes chosen ways of heating objects, their technical construction and principal of function. It states their advantages and disadvantages and compares them according to their purchase and operating costs. It also states progression of costs of electric energy, natural gas and wood pellets and their availability. Part of the thesis is calculation of heat loss and heat energy needed for heating and for service water heating. Based on these calculations the thesis compares purchase and operating costs for period of 10 years and deals with the most crucial factors that affects choice of heating system in current time.
Substitution for a current source of heat in the industrial area
Novák, Jan ; Fiedler, Jan (referee) ; Lisý, Martin (advisor)
The main aim of the thesis is to design a final draft for the reconstruction of the central heating plant of the industrial complex. The background research outlines a brief description of the development of heating plant industry, boilers and conditions for the selection of a suitable heat source for the particular area. Further, there are listed standard possibilities of heat sources for industrial complex, which does not use heat for technological purposes only, but as well as for heating and warming up of supply water. The finding and presentation section summarize the current energy supply and the design of two variants for conceptual modernization of the boiler plant. According to the annual and daily chart for the need for heat, there are specified required heat outputs, which are supposed to be distributed to the campus network of heating and as well as the fuel consumption. One of the options considers the use of storage tanks. The conclusion compares both suggested options.

Interested in being notified about new results for this query?
Subscribe to the RSS feed.